Top-rated generator installers.

Find top rated generator installers in your area

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Generator installers near you

Generator Install FAQs

Annual maintenance is recommended for transfer switches to ensure reliable operation when needed. A qualified technician should check electrical connections, test switching mechanisms, and inspect for signs of wear or corrosion. 

These maintenance visits take less than an hour and help identify potential issues before they cause failure during an outage. Regular maintenance also extends the operational lifespan of your transfer switch and helps maintain warranty coverage.

A standard transfer switch installation takes between two and four hours for a professional electrician, though this can extend to a full day for more complex setups. Straightforward installations with good panel access move quickly, while homes requiring electrical upgrades or with challenging access points take longer. 

The timeline may extend further if permits are required, as inspection scheduling depends on local authority availability.

While it's technically feasible to pair a manual transfer switch with a standby generator, this combination diminishes one of the primary benefits of standby systems—automatic operation during outages. 

Standby generators are designed to provide seamless power transitions, which requires an automatic transfer switch for full functionality. If budget constraints make an automatic switch impossible, a manual option will work, but it requires your presence to activate during outages.

Older homes often require electrical panel upgrades before a transfer switch installation. Your electrician may recommend replacing outdated panels, installing a subpanel, or updating circuit breakers to safely accommodate the transfer switch. 

While these upgrades increase your initial investment, they provide improved electrical safety throughout your home and ensure your generator system functions properly during outages.

Yes, transfer switches must comply with specific National Electrical Code (NEC) requirements and local regulations. Most jurisdictions mandate professional installation with proper permits to ensure safety standards are met. These codes regulate installation methods, proper grounding, switch ratings, and placement to prevent dangerous backfeeding into utility lines. Local requirements may also specify minimum distances between generators and structures or additional safety features for specific applications.

The , homeowners’ guide to generator installations
From average costs to expert advice, get all the answers you need to get your job done.
A residential home generator in a house backyard
Apr 30, 2025
Apr 30, 2025
Budget for whole-house generator installation costs based on factors such as unit capacity, fuel type, generator type, labor, electrical upgrades, and more.
An outdoor natural gas generator
Nov 10, 2022
Nov 10, 2022
HomeAdvisor’s natural gas generator cost guide covers whole-house costs for home installation. Use this guide to find costs for your generator installation project.
A house with solar panels and a windmill on the roof
Jan 11, 2022
Jan 11, 2022
If you want to make your home more energy-efficient with wind energy, this cost guide outlines the cost to install a wind turbine and other determining factors.
Share project details to get started.