Top-rated yard grading pros.

Find top rated yard grading pros in your area

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Yard grading pros near you

Yard Grading FAQs

The best time to level a yard is in the spring when the soil is an ideal mix of moist and dry. Completing your leveling project early in spring also reduces the chances of erosion damage from water movement through the spring and summer.

The average time to level a yard is five to six days. Smaller yards and projects may be completed in as little as a day, while larger projects may take up to a week.

If you only need to regrade a small area—for example, around a mailbox—DIY resloping may be manageable. However, major releveling projects such as resloping an entire yard typically require a lot of labor and heavy equipment operation, which is generally best left to the pros.